Engineering consultation services of research reactor construction

Engineering consultation services of research reactor construction

Project management including compilation of method and executive organizing, planning and project control, work reference to professional companies and organizations, coordination and executive management of project, estimation and control of payments and educational planning.

The plant of sulfuric acid production of Sarcheshmeh

The plant of sulfuric acid production of Sarcheshmeh

Project management Consultation at engineering section (local and external), purchase, construction, installation, and engineering for part of civil and electrical activities.

Third Aromatic plan of Bandar Imam (construction of petrochemical complex with the capacity of 40/000 tons, Paraziline 179,000 tons of Gasoline, and 30,000 tons of Orthozaline)

Third Aromatic plan of Bandar Imam (construction of petrochemical complex with the capacity of 40/000 tons, Paraziline 179,000 tons of Gasoline, and 30,000 tons of Orthozaline)

Project management consultation and workshop supervision and establishing for technical documents center (DCC) at workshop.

The development plan of Mobarakeh Steel Complex (increasing production capacity of steel sheet of complex from 3 million tons to 4.1 million tons annually and improvement of quality of all steel products).

The development plan of Mobarakeh Steel Complex (increasing production capacity of steel sheet of complex from 3 million tons to 4.1 million tons annually and improvement of quality of all steel products).

Project management consultation (PMC), developing method and planning execution, project control and provision of combinational plans and physical progress of the development of construction units, execution of all project management services including: time, budget, commodity and local/external contracts in the field of iron-manufacturing, steel-manufacturing, hot roll, cold roll, energy, fluids and engineering.

The construction plan of PVC Unit of Arvand Petrochemical

The construction plan of PVC Unit of Arvand Petrochemical

Project Management Consultation (PMC) by participation of English corporation; STONE &WEBSTER (after ending first year, Aria undertook project management responsibility independently). Project management services, reviewing documents of detailed engineering in local, external purchasing and construction, installation of all units, pre-commissioning, commissioning settling commodity and financial account with contractors and consultants. In this project, the participation of Sazeh company and UHDE had undertaken the responsibility of EP of the main unit. There were more than 80 domestic and foreign contractors in construction activities and installation of complex.

Project Management of Bandar Imam Petrochemical Complex's Projects (PGH, HDPE, ARF)

Project Management of Bandar Imam Petrochemical Complex's Projects (PGH, HDPE, ARF)

Management Contractor (MC) in evaluation and implementation of HDPE project, appointment of contractors, procurement, construction and installation management, pre-commissioning, commissioning, commodity, technical and financial settlement with all contractors, advisors and manufacturers. In this project, Namvaran Company had engineering responsibility.

Fajr Petrochemical project management and engineering services

Fajr Petrochemical project management and engineering services

Detailed engineering of Utilities section and Off-site phase II & phase I extension.

Designing station for gas pressure enhancement of Abshirin

Designing station for gas pressure enhancement of Abshirin

Basic design and detailed engineering - the scale of engineering work was 17000 persons hourly and it was the first project in which Aria played the role of basic designing.

Study project of the rule “maximum use of man power of local companies”.

Study project of the rule “maximum use of man power of local companies”.

To study background of law enforcement and its executive effects on 5 selected projects as IMIDRO and report representation.

Construction Petrochemical Complex 9th Olefin of Asalouyeh Port (Aria-Sasol)

Construction Petrochemical Complex 9th Olefin of Asalouyeh Port (Aria-Sasol)

Management Contractor (MC) by participation of british STONE&WEBSTER Company – planning and control of all activities in engineering, procurement and installation.

Completion of 72 km of 26" Pipelines of raw oil (Tang-e-Fanni.)

Completion of 72 km of 26" Pipelines of raw oil (Tang-e-Fanni.)

feasibility study of lands Acquisition, Inspection of manufacturers’ equipment, Evaluation and confirmation reports of the type of ground layers and pipeline widening, Support required technical services of client, Workshop supervision.

Development and optimization of Esfahan Refinery

Development and optimization of Esfahan Refinery

Management Contractor (MC), evaluation of detailed design documents, procurement management and commencement of construction and installation of EPC project by participation of Tarh-O-Palayesh Engineering Company (T.O.P.), Perlite Constraction Co. and Maysun Co. were assigned, Tarh-O-Palayesh Engineering Co. is responsible for designing. Aria had undertaken the responsibility of evaluating documents in Tehran Office and then attended at workshop (refinery) for the supervision of construction operation and installation.

Project management services for gas fluids of Bandar Abbas Refinery (Persian Gulf Star Oil).

Project management services for gas fluids of Bandar Abbas Refinery (Persian Gulf Star Oil).

Executive Project consultation by participation of Bamdad Badakhsahn Company. The project includes three subprojects for refinery, watering from sea and transmission feed pipelines. At refinery, the role of consultation and workshop supervision was under the shoulder of engineering and evaluation of documents in Tehran and Milan were due to consultant and regarding two other subprojects, the selection of contractor and workshop and the rest on the execution of operation were assumed as the responsibility of consultant.

Designing and engineering services of industrial site and off-site D

Designing and engineering services of industrial site and off-site D

Designing completion, basic engineering, designing and detailed engineering.

To perform engineering services of minor modifications in sea platforms of phases 6, 7, 8 of South Pars.

To perform engineering services of minor modifications in sea platforms of phases 6, 7, 8 of South Pars.

Engineering services and supervision on construction and installation of parts.

Evaluation services and completion of basic engineering and execution of detailed engineering and provision of PC documents for the collection center of Day Gas Field and separation & collection center of Sefid Zakhor Gas Field.

Evaluation services and completion of basic engineering and execution of detailed engineering and provision of PC documents for the collection center of Day Gas Field and separation & collection center of Sefid Zakhor Gas Field.

evaluation and confirmation of documents regarding detailed engineering, completion of studies and selection of geo-technique consultants - passive defense - cathodic and Hazop protection and to perform detailed engineering.

Establishing Hydrogenation unit C5 / C4 Refinate and rebuilding of PSA Unit of Tabriz Petrochemical.

Establishing Hydrogenation unit C5 / C4 Refinate and rebuilding of PSA Unit of Tabriz Petrochemical.

Designing, procurement operation, construction, installation and commissioning. In this project, AXENS and LINDE Companies were participated as subcontractors as licensed companies.